CO-OPERATION WITH THE INDUSTRY
|
Among most
significant contracts carried out for the industry within
the last years, the following can be mentioned:
ˇ control system of the converter gas recovery system in the
steel plant (1996-1999);
ˇ concept and execution of the complete active magnetic system
for damping and control of vibrations of the overcritical
power-transmitting shaft (2002);
ˇ project of modernization of propylene compressors (2002),
air compressors (2003-2004), natural gas compressors (2005),
soda gas compressors (2005);
ˇ evaluation of the compliance with the API 612 Standard of
the design of HP and LP control valve block in the 24 MW
turbine (2002);
ˇ
evaluations of the technical state of the turboset and
determination of the causes of its failure (2001, 2005);
ˇ evaluation of operating capabilities of the steam turbine
under an increased steam flow through its LP part (2002);
ˇ revamp of two turboblowers for the paper making plant
(2000-2001);
ˇ permanent supervision and correction of the flow measurement
system in the large, municipal sewage treatment plant
(ultrasonic method), since 2000;
ˇ
design and start-up of the installation increasing biogas
pressure in a sewage treatment plant, and supervision over
the start-up of the 3MW biogas power plant (2000-2005);
ˇ expertise on the causes of the turbine flowmeter failure in
the natural gas pumping station (2003);
ˇ design of a system of profile auto-ejectors for the
production line, 2007;
ˇ design and execution of four systems of auto-ejectors for
the welding, symmetry control of locks and running-in
stations for profiles, 2007-2008.
Upon request,
the Institute of Turbomachinery can provide references
concerning the contracts accomplished for the industry. |